State-of-the-art
equipment is used in each step of the processing, from
pole peeling, to automated kiln drying, pressure treating
and accelerated fixation. Inspection procedures after
the pressure treating process are performed by qualified
quality control personnel according to CAN/CSA O80 and/or
AWPA standards. An on-site laboratory is used to perform
various quality control tests such as preservative concentration,
retention, penetration and fixation.